ICE worked with the Architect and owner to provide the facility with a complete electrical system that included running conduit, pulling wire, and installing all electrical devices throughout the facility. This project was a design-build electrical that was provided by the ICE team. This project was installed on time and in budget.
Location: 419 US-51 BYP, Dyersburg, TN 38024