Project Description
ICE worked with the Architect and owner to provide the facility with a complete electrical system that included running conduit, pulling wire, providing fire alarm and installing all electrical devices throughout the facility. This project was a specified engineered package. This particular project had a very tight installation schedule and was done on time and within the owner budget.
Location: 580 Highway 51 Bypass East, Dyersburg, TN 38024