Project Description
ICE provided a complete design and installation of the upsetter process line for the Tenaris Hickman tube manufacturing facility in Blytheville, Arkansas. This project involved full scaled control engineering design, panel design, panel UL fabrication, PLC & HMI programming and a complete turn-key installation. This project was installed with a stringent schedule and was installed successfully on time and within budget.
Location: Various Locations