Project Description
ICE provided the electrical upgrades at the Union City Water and Wastewater Treatment Plant (WWTP). This project included running conduits underground in duct banks, along the filter basins and inside the electrical room. This project was utilized with coated conduit and required special installation methods. ICE wired all the new controls and provided control cabinets as specified for a complete operating system. This project required multiple electricians and was done on time and within budget.
Location: Union City, Tennessee